Within the recent 9 years we have performed quite a lot of different studies, made hundreds of tests, trying to understand the problematic points and bottlenecks of the existing methods of CO2 withdrawal from the industrial processes, and based on a profound analysis of all the activities done, we tried to find the most viable and cost effective methods of CO2 mitigation, designed and manufactured a number of pilot plants, which allowed us in 2021 to design and build the 18,000 tpa CarbonCapt-Trad LP unit, the first industrial installation for effective CO2 withdrawal at the gas-piston power station.
In June, 2025 the the CarbonCapt-Trad LP has been operated for 4 years, we developed a number of interesting projects with our international partners and held additional tests for a number of innovative processes, which now could be introduced to the global carbon intensive industries.